|
Adelaide Oval - Western Stand Redevelopment Hanson Associates provided full design, documentation and tender management of audio visual presentation and speech reinforcement systems for the new corporate entertainment and conference venues. A key component of our services was the integration of MATV and electronic signage systems in both public and corporate function spaces within the Western Stand Redevelopment. Our role included a peer review of the broadcast equipment proposed for the control room production system being designed in-house by SACA. |
|
Melbourne 2006 Commonwealth Games Hanson Associates was responsible for establishing environmental noise limits and sound system control measures during the rehearsals and opening and closing ceremonies. |
![]() |
|
![]() |
Curve Bar Hanson Associates was commissioned to design a high quality DJ and background sound system for the Curve Bar located in the Arts Centre Theatres building. |